0577-25550578 6274698@qq.com
Location:Home > News > Industry News

Operating procedures for spray painting assembly line

1、 Purpose: To establish standards for spray painting work, document work methods, and pass on work experience



2、 Scope of application: Applicable to the operating specifications of the spray painting assembly line in the company's spray painting workshop


3、 Homework Procedure:


(1) Confirm that there are no objects obstructing the smooth flow of the assembly line on the route


(2) Press the main power switch to turn on the power


(3) Adjust the temperature knob to meet the temperature requirements of the sprayed material


A. Amino drying paint between 130 ℃ -140 ℃


B. Electrostatic spraying between 180 ℃ and -190 ℃


C. Self drying paint shall not exceed 50 ℃


(4) Open the vacuum hood button


(5) Turn on the air pump button to inflate it


(6) Hanging objects shall not exceed the width and height of the passage


(7) Adjust the speed knob to match the painting speed, but ensure that the painted object stays in the drying box for 20-30 minutes


(8) Implement paint spraying work


(9) When stopping painting, the assembly line speed must be lowered until it stops before pulling down the main power supply. It is strictly prohibited to directly pull down the main power supply to avoid damage to the motor and circuit


(10) Each refueling point on the assembly line should be refueled regularly, 2-3 times a month. The fastening bolts and nuts of the line should be checked regularly, and if there is any looseness, they should be tightened in a timely manner to ensure smooth and safe production of the line.


Scan to access
© 2025 Zhejiang Huike Intelligent Coating Equipment Co., Ltd All rights reserved.   浙ICP备2022019370号-1 浙公网安备33032602100619号